Patios And Slab Work Specification

1. Excavate desired area to be slabbed. no skips will be used.
2. Lay Terram membrane over excavated area.
3. Install desired amount of MOT type 1 crushed limestone sub base.
4. Lay slabs on a mortar base with slurry.
5. Pointed in desired colours to suit customer.